The images to the right are all pictures taken from a build out in Birmingham MI. The top image is a large junction box that has been mounted and is waiting to be pulled. You can also see the fire retardant that has been applied to the holes that were created while piping to the box. The following picture shows a ceiling with recessed lighting waiting for drywall. The following two pictures show in wall wiring.